Window, Door and Siding Permits

A building permit is required for new or replacement windows, doors and siding. Masonry veneer requires building permits.

Windows in a multi-colored building

Project Details

Please note that the required project details will vary based on each project's unique characteristics.

  • Window Replacements (number of individual windows)
  • Door Replacements (number of individual doors)
  • Exterior Veneer or Soffit valuation (not including window/door value)
  • Windows Mulled together (Yes/No)
  • Mullion FL Product Approval Number
  • Window/Door FL Product Approval Number
  • Window/Door Manufacturer
  • Ext. Veneer/Soffit FL Product Approval Number
  • Ext. Veneer/Soffit Manufacturer
  • Ext. Veneer/Soffit Material and Applied Over

Project Checklist, Affidavits and Information Sheets

Review Time Frame

The review time frame for a window/door/siding permit is 5 work days.